Riyadh Metro line 5. Kingdom of Saudi Arabia

Home / riyadh-metro-line-5-kingdom-of-saudi-arabia

Construction design of 3 deep underground stations, 1 underground depot with a built area of more than 44.000m2 and 13 ventilation and access shafts. A multidisciplinar team of more than 100 engineers was dedicated to the project. BIM methodology is used for the design of all disciplines (architectural design, structural design and MEP design).