Execution projects of the water supply of the northern Osona system. 1st and 2nd phases.
Drinking water treatment plant for 15,000 m3/day with 2 pumping stations of 310 m3/h up to 90 mwc and 20 m3/h up to 125 mwc.
– Regulation reservoirs of 1,000 m3.
– Pipelines of 350, 300, 225 and 150 mm diameter.
– Flow study.
– Design of singular structures: drinking water treatment plant and pumping stations.
– Hydraulic calculations.
– Structural calculations.
– Alignment studies.
– Electrical calculations and design of control systems.
– Expropriations and relocation of affected services.
– General coordination of the project.
– Relations with the Administration.




