ENVIRONMENTAL IMPACT STUDY OF THE FEASIBILITY STUDY OF A CONNECTION BETWEEN THE A4 MOTORWAY AND THE CITY OF BIZERTE
Environmental impact study of the feasibility study of a permanent connection between the A4 motorway and the city of Bizerte, crossing the Bizerte maritime canal, by means of an expressway-type road accessible without interruptions (main project of global and peri-urban scope) 8 km long.
Design speed: 80/60 km/h interurban/urban
Cross-section: 2+2
Study and analysis of technically viable alternatives
Analysis and study of 7 corridors and 12 alternatives
Study of the environment and development of the sensitivity map
Comparison of impacts of the alternatives and multi-criteria analyses
Development of the impact study
Study of the environment
Impact assessment
Development of corrective measures
Drafting of the environmental monitoring plan
Plans of the corrective measures
Budget of the corrective measures






